Client
Newfoundland and Labrador Hydro
Project Location
Bay d’Espoir, NL, Canada
Timeframe
2021-2023
Longevity and Reliability
The project outcomes have provided Newfoundland and Labrador Hydro with a detailed and optimal strategy for the life extension of their penstocks, based on thorough risk assessments, cost-benefit analysis, and carefully crafted execution plans. This strategic approach not only preserves the infrastructure but also ensures its integrity and reliability for the future, demonstrating Kleinschmidt’s commitment to delivering tailored, impactful solutions to our clients.
Innovative Construction Plans:
Detailed construction execution plans were prepared, aligning with AACE Class 3 standards and incorporating comprehensive health, safety, environmental, and QA/QC planning.
Strategic Collaboration:
The integration of expert advice from Chant and Skarborn ensured that the life extension strategy was robust, cost-effective, and technically sound.
Reduced Construction Impact:
Proposed enhancements would enable the use of pre-coated penstock segments, significantly reducing the need for extensive field welding and thereby cutting down on field work and associated costs.