Client
Salt River Project/Bureau of Reclamation
Project Location
Horse Mesa Dam, Maricopa County, AZ
Timeframe
2017-2019
Operational Efficiency
This project showcases Kleinschmidt’s steadfast commitment to empowering our clients with cutting-edge engineering solutions that boost operational efficiency and promote sustainability in energy production. In collaboration with SRP, we achieved hydropower facility modernization, securing enhanced reliability and safety for the future.
Efficient Site Analysis:
Beginning with a detailed site analysis, we utilized advanced 3D scanning to understand the spatial constraints within the powerhouse. This critical information guided our strategy for the selective demolition necessary to improve access for valve replacement.
Rigorous Testing for Integrity:
To address gaps in historical data, we implemented a thorough testing plan, including non-destructive scanning and concrete coring. This was essential for verifying the structural integrity and compatibility of the larger valves within the powerhouse’s unique environment.
Customized Installation Strategy:
Acknowledging the logistical challenges, we created an innovative structural loading dock platform to facilitate the safe removal and installation of valves. This solution optimized the use of space and minimized disruption.
To address gaps in historical data, we implemented a thorough testing plan, including non-destructive scanning and concrete coring. This was essential for verifying the structural integrity and compatibility of the larger valves within the powerhouse’s unique environment.
Proactive Design and Constructibility:
In collaboration with SRP and the construction team, Kleinschmidt prioritized the project’s constructability from the outset. This focus ensured that the integration of new valves with the existing equipment was both safe and seamless, reinforcing the facility’s capacity for sustainable energy generation.