The Augusta Canal Authority required engineering services for the First Part 12D Safety Inspection of the Enterprise Mill Hydroelectric Project conducted as a Condition Assessment (CA). Despite this Part 12 inspection being conducted as a CA, the owner obtained a waiver from the Risk Analysis portion of the process.

Kleinschmidt completed the CA in three phases:

• Phase 1 – Comprehensive Assessment Preparation
• Phase 2 – PFMA and Part 12 Inspection
• Phase 3 – Comprehensive Assessment Report

Our approach resulted in an effi cient process following the FERC Guidelines, while simultaneously integrating the work with the Augusta Utilities District (AUD). AUD performed a Part 12D Periodic Inspection of their 7-mile-long August Canal alongside Enterprise Mill’s Comprehensive Assessment to reduce overall level of effort and resources needed and to utilize personnel from both organizations during the process to share experiences and cross-train. Additionally, the reporting and Potential Failure Mode Analysis workshop were completed and documented in a manner that will lend well to the planned Comprehensive Assessment in 2029. The forward-thinking approach reduced level of eff ort, increased efficiency for both the licensee and consultant, and will allow for organized and informed preparation for the future work.

Kleinschmidt was able to work with the owner to navigate the new FERC Part 12 process for a project undergoing its fi rst Part 12D Safety Inspection as a recently classified high-hazard project. We also worked with the owner of the Augusta Canal to reduce overall costs and improve the eff ectiveness of the process by conducting both Part 12 inspections simultaneously. This approach resulted in a simple, more straightforward learning process for the Enterprise Mill staff. Additionally, end deliverables will aid the future Comprehensive Assessment process in 5 years and work well between both Augusta Canal and Enterprise Mill.

Client:

Augusta Canal Authority

Project Location:

Augusta, GA

Services Provided:

  • Dam & Spillway Inspections and
    Design
  • FERC Part 12 Dam Safety Inspection
  • Comprehensive Assessment
  • Field Inspection
  • PFMA Workshop

Project Timeframe:

2023 – 2024

Regional Vice President

Steve Layman, Ph.D.

“I really enjoy the energy and collaborative spirit for sound science and creative solutions that protect the environment here at Kleinschmidt.” Steven Layman has over 35 years of hydropower-specific experience and is Kleinschmidt’s Southeast Region Vice President. Steve is a senior aquatic ecologist and fisheries biologist who specializes in leading ecological assessments and managing project...

Let's
Chat!

This field is for validation purposes and should be left unchanged.