Enterprise Mill Comprehensive Assessment
The Augusta Canal Authority required engineering services for the First Part 12D Safety Inspection of the Enterprise Mill Hydroelectric Project conducted as a Condition Assessment (CA). Despite this Part 12 inspection being conducted as a CA, the owner obtained a waiver from the Risk Analysis portion of the process.
ExploreEnterprise Mill Comprehensive Assessment
The Augusta Canal Authority required engineering services for the First Part 12D Safety Inspection of the Enterprise Mill Hydroelectric Project conducted as a Condition Assessment (CA). Despite this Part 12 inspection being conducted as a CA, the owner obtained a waiver from the Risk Analysis portion of the process.
Explore